Customization: | Available |
---|---|
Certification: | ISO9001, CE |
Standard Component: | Standard Component |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The automatic stopping device of the PZ12V190 diesel engine produced by Jichai is a low oil pressure automatic stopping device, which is controlled by the oil pressure of the diesel engine.
Supply 190 parts: engine body, crankshaft, 12VB.03.00 diesel engine cylinder head assembly, gas engine cylinder head assembly, 16V gas engine cylinder head assembly, 190 connecting rod assembly, connecting rod tile, thrust tile, thrust piece, Z12VB.05.01C piston, 190 cylinder liner, supercharger (20GJ supercharger, SJ160 supercharger, J170 supercharger), intercooler. 12VB.22.00B water pump, Jichai overhaul kit, full gasket, 190 camshaft, air motor, electric starter motor, 3411 high play coupling, Changsha Zhengsheng piston ring set, 190 intake and exhaust valve and seat, three-core speed sensor, instrument panel, STITT spark plug, ignition coil, 127.90.10 high voltage cable, ignition controller, 190 oil filter, 190 accessories 12VB.21.00 oil cooler, high pressure oil pump, speed governor, centrifugal filter, Jichai oil filter, Jichai 12V190 parts, Jichai air filter, Jichai triple filter, Jichai narrow V-belt, Jichai oil injector, Jichai ZCK150S835 oil injector coupling, ZCK150S840 oil injector coupling, 12V.29.00 hand crank oil pump, 307.54. 00 electric pre-fuel pump, sea water pump, Jichai hydraulic coupling parts.
Disassembly and inspection of low oil pressure automatic stopping device for Jichai generator sets, drawing no. 12VB.34.00A, double pressure low oil pressure stopping device drawing no. 129.34.00A
When oil leakage is found at the slide valve, or when there is a delay in the action of the fork, the oil pressure low automatic stopping device should be disassembled and inspected
Spare parts for 12V190 | |||
No. | Part Name | Part Number | Qty |
1 | CYLINDER BLOCK ASSEMBLY | Z12VB.01.00 | 1 |
2 | CRANKSHAFT ASSEMBLY | 12VB.02.00 | 1 |
3 | CYLINDER HEAD ASSEMBLY | 127.03.00 | 12 |
4 | OIL SUMP ASSEMBLY | 12VB.04.00B | 1 |
5 | PISTON AND CONNECTING ROD ASSEMBLY | 127.05.00 | 12 |
6 | CAMSHAFT AND GEAR TRAIN ASSEMBLY | 127.06.00 | 1 |
7 | TORSIONAL VIBRATION DAMPER ASSEMBLY | 12VB.07.00 | 1 |
8 | INTAKE LINE ASSEMBLY | 127.08.00B | 1 |
9 | EXHAUST LINE ASSEMBLY | 127.09.00A | 1 |
11 | NATURAL GAS PIPELINE | 127.14.00 | 1 |
12 | MEGNETO TRANSMISSION ASSEMBLY | 127.15.00 | 1 |
13 | OIL PUMP ASSEMBLY | 12V.17.00C | 1 |
14 | OIL FILTER ASSEMBLY | 12VB.18.00B | 1 |
15 | CENTRIFUGAL FILTER ASSEMBLY | 12VB.19.00 | 1 |
16 | LUBRICATING PIPING | 127.20.00 | 1 |
17 | OIL COOLER ASSEMBLY | 12VB.21.00 | 1 |
18 | WATER PUMP ASSEMBLY | 12VB.22.00B | 2 |
19 | Cooling line system | 127.24.00 | 1 |
20 | INTER-COOLER ASSEMBLY | 12V.27.00 | 1 |
21 | HAND PRIMING OIL PUMP ASSEMBLY | 12V.29.00 | 1 |
25 | OVERSPEED SAFETY DEVICE | 12VB.37J2.00 | 1 |
26 | SPECIAL TOOLS | 127.42.00 | 3 |
27 | COUPLING ASSEMBLY | 163.44.00 | 1 |
29 | ELECTRIC STARTING SYSTEM | 127.46D.00 | 1 |
30 | OIL PUMP BRACKET ASSEMBLY | 12VB.48.00 | 1 |
31 | CARBURETTER ASSEMBLY | 127.86.00 | 2 |
32 | NATURAL GAS PRESSURE REGALATING VALVE | 127.87.00 | 1 |
33 | GOVERNOR CONNECTION ASSEMBLY | 127.89.00 | 1 |
35 | Electromagnetic valve | 127.91.00 | 1 |
36 | TURBOCHARGER ASSEMBLY | 127.20GJ.00EB |
12VB.24.130 |
13D021000003 |
Z12VB.06.40A |
Z12VB.06.50A |
511.15.20.01C |
12VB.02.22 |
12VB.02.22(GBZ) |
4008LBS.02.02 |
511.02.06E |
224L.06.12 |
3012T.06.05 |
511.06.04A |
608L.06.01 |
Z12VB.06.18A |
8V.06.10B |
601.06.50.01B |
264L.06.60.01 |
601.03.20.01A(GBZ) |
286L.01.51 |
JiNan GuoHua Green Power Equipment Co.Ltd, is professional production in diesel generator sets, gas generator sets and parts for nearly 12 years, covering production, sales and maintenance, having SGS general notary certificate,etc. At present, we have formed a perfect sales and maintenance sreveice system. And have set up two workingroom, covering an area of more than 5,000 square meters.
Our Main Buseness
Q: Do you offer OEM services? |
A: Yes, we can customise our generator sets to meet customer requirements. |
Q: How do I choose the power? |
A: Collect all the power of your equipment, taking into account your current. |
Q: What is your payment method? |
Q: What is your order quantity? |
A: 1 piece or more |
A: 30% T/T in advance, the balance before delivery. |
Q: How long is your delivery time? |
A: Approximately 30 days after receipt of the deposit. However, if your order has some special designs, then the delivery time will be longer. |